Two 10.4m M-reels were delivered after a very hectic design/engineering, DNV certification and manufacturing period of in all 3 months.
The reels with 300t payload capacity were delivered with one divider each.
+
Two 10.4m M-reels were delivered after a very hectic design/engineering, DNV certification and manufacturing period of in all 3 months.
The reels with 300t payload capacity were delivered with one divider each.
Quick and Safe supply of M-Reels®